+8618117273997 weixin
en English
Posttime: 07 Nov, 2017 Views: 60 Author: Jacky

LISUN engineer visit Spain to do installation & training

LISUN engineer visit Spain to do installation & training

 

LISUN engineer visited customer in Spain in July, 2017 and completed the installation and training tasks. This customer is a big lighting factory, they purchased a set of LMS-1900B Near Field Moving Detector Goniophotometer & IS-3.0 Integrating Sphere Test System from LISUN.

 

Usually, there are 2 hemispheres, customers should install them to one sphere. But this installation task is more complex. The volume of the ball is relatively large, and there is not simply two hemispheres here. They use two days to install the Integrating Sphere. The third day began the product training and operational exercises.

 

Finally, share some photos here:

Picture 1: LISUN engineer is guiding to install the integrating sphere

Picture 1: LISUN engineer is guiding to install the integrating sphere

Picture 2: LISUN engineer is guiding to install the integrating sphere

Picture 2: LISUN engineer is guiding to install the integrating sphere

Picture 3: Customer are doing test operation

Picture 3: Customer are doing test operation

Picture 4: LISUN engineer (right) and customer’s engineer (left)

Picture 4: LISUN engineer (right) and customer’s engineer (left)

Leave Message

Your email address will not be published. Required fields are marked *

=